The first and easiest place to start in understanding whether your product will comply is to look at its overall construction. Because we are dealing with lighting products and the carrying of electrical current over metal conducting material, or “live” current-carrying parts, you should always ensure that you’ve used a corrosion resistant metal or alloy such as silver, copper, copper alloy, plated iron or steel, or stainless steel. This may seem obvious to the product designer, but there are many products submitted each year to the major NRTLs that fail compliance on this basis alone.
This process has led production people to do small runs of 50 or 100 units, then they call us so they can avoid the whole system of full certification and follow-up service. We come to the site, inspect the units, label them, and then we go away. If you have another small run we can come back and do it again. We’ve already done the testing , so this time all we have to do is verify that the units you want labeled are the same. Once we do we put a sticker on them. That makes this follow-up less costly. Once we’ve labeled the units, we’re gone. In cases like these we are red-tag erasers. If you get red-tagged we can free the piece of machinery so you can get back into production.
Having Trouble getting your project across the Finish Line at your NRTL?
We are here to help you!
Client A had been working with a NRTL for 15 months. Staff from the USA and Europe had also visited them at their facility multiple times only to be sent construction letter after construction letter. Once they heard from the engineer that the project was in for final review but nope, only to be sent another construction review letter outlining brand new items that would not be accepted.
With the frustration mounting, they Google “Help with NRTL” and found Product Safety Consulting Inc.!
We reviewed the latest two construction letters, went online and ordered a Certified Wiring Harness and various components, contacted the NRTL and presented the changes and reached agreement, flew to Europe and updated the construction, help modify the NRTL draft report, submitted the revised report, photos and illustrations to NRTL and 7 days later we were scheduling the IPI inspection for this brand new client for this NRTL. Total work time was 15 business days.