Heat-treatment Fiberglass Sleeving, View Fiberglass Sleeving ...

Fiberglass sleeving is often used in many different types of electrical products.  It is used to insulate from heat.  It is used to hold wires together.  It is used to cover splices.    It comes in different materials for different applications. 

 

It is important to know there are difference types of sleeving and although it says UR, it may be the wrong UR category.  There are two main categories UL Recognizes Sleeving under – Flame Retardant and Coated Electrical.  The last thing you want to do is pick the wrong one, order 100,000 feet of it, go into production only to find out 2 weeks before shipping it is UR in the wrong category.

 

 

UZIQ2.GuideInfo - Sleeving, Flame Retardant – Component

 

CONDITIONS OF ACCEPTABILITY

Consideration is to be given to the following Conditions of Acceptability when these components are employed in the end-use equipment:

1. This sleeving has not been investigated for any electrical or mechanical capabilities.

2. This sleeving has not been investigated to determine its thermal performance.

3. This sleeving has not been investigated for use in contact with sharp edges, corners, projections or burrs, or where subject to tension, compression, abrasion, repeated flexing or where exposed to ultraviolet radiation or oil contamination.

 

 

UZFT2.GuideInfo - Sleeving, Coated Electrical - Component

 

CONDITIONS OF ACCEPTABILITY

Consideration is to be given to the following Conditions of Acceptability when these components are employed in the end-use equipment:

1. Sleeving shall not be used over the maximum voltage rating.

2. Sleeving shall not be used over the maximum temperature rating.

3. The minimum wall thickness of the sleeving shall comply with the requirements of the end product.

4. Sleeving marked "Oil Resistant 60°C " or "Oil Resistant 80°C" has been investigated for intermittent or occasional contact with oil not exceeding the oil rating.

5. Sleeving marked "VW-1" has been investigated using a fine wire support in conducting the flammability test.

6. Sleeving is not acceptable for use in contact with sharp edges, corners, projections or burrs , or where subjected to tension, compression, abrasion or repeated flexing without additional testing.

7. Sleeving is not recommended for use where it is feasible to employ a standard insulated conductor (appliance wiring material) intended for the purpose.

8. Sleeving shall be used in dry and damp locations only as defined in ANSI/NFPA 70, "National Electrical Code."

EU Construction Products Regulation

By Dan Arnold, Sales Engineer

Product Safety Consulting Inc.

 

 

 

We hear from numerous manufacturers currently precluded from selling in the EU because their products are not CE marked.   This is especially true of construction products, which are often sold under large contracts that specify CE marking.  Construction products are a good example of a well-established Directive being transitioned to a Regulation, which we covered in a previous article.  Construction Products Directive 89/106/EEC (CPD) was fully replaced by Construction Products Regulation 305/2011/EU (CPR) on 1 July 2013.  The CPR has several interesting differences from the more common Directives and Regulations used for electrical products.

 

Instead of the more familiar Declaration of Conformity (DoC), the CPR requires a Declaration of Performance (DoP).  Although basic information of DoC and DoP is the same, the DoP requires a declared performance level of essential characteristics.  One example characteristic is compressive strength for some structural products.  The essential characteristics are an important CPR concept and are in the harmonized standards for each construction product type or family.  The performance levels of essential characteristics are intuitive for construction products, which must have physical integrity to function as intended over many years.  Performance to at least one essential characteristic must be declared, but to be competitive and comply with the intent of harmonized standards, multiple characteristics are likely.

 

Another important attribute of the CPR are the Assessment and Verification of Constancy of Performance systems (AVCP systems).  The AVCP is a surveillance mechanism to ensure the declared performance of essential characteristics is maintained. Each essential characteristic specified in a harmonized standard will have one of these AVCP system numbers assigned: 1+, 1, 2+, 3 or 4, from most to least comprehensive.  System 1+ requires the manufacturer to maintain Factory Production Control (FPC) and periodically test samples.  It also requires a Notified Body to assess product performance, initially inspect the manufacturing plant and FPC, periodically assess the FPC, and audit test the product.  Conversely, AVCP system 4 only requires the manufacturer to assess performance and maintain FPC.

 

CE marking can be arduous for some construction products, but the legislation and compliance scheme is well established and generally intuitive, given the critical function of these products.  Product Safety Consulting can help manufacturers understand the requirements and achieve CE compliance.

 

 

 

References:

 

https://ec.europa.eu/growth/sectors/construction/product-regulation_en

 

https://ec.europa.eu/growth/content/ce-marking-construction-products-step-step-guide-now-available-all-eu-languages-0_en

 

Having Trouble getting your project across the Finish Line at your  NRTL?

We are here to help you!

Client A had been working with a NRTL for 15 months. Staff from the USA and Europe had also visited them at their facility multiple times only to be sent construction letter after construction letter. Once they heard from the engineer that the project was in for final review but nope, only to be sent another construction review letter outlining brand new items that would not be accepted.

With the frustration mounting, they Google “Help with NRTL” and found Product Safety Consulting Inc.!

We reviewed the latest two construction letters, went online and ordered a Certified Wiring Harness and various components, contacted the NRTL and presented the changes and reached agreement, flew to Europe and updated the construction, help modify the NRTL draft report, submitted the revised report, photos and illustrations to NRTL and 7 days later we were scheduling the IPI inspection for this brand new client for this NRTL. Total work time was 15 business days.

Give us a Jingle and let us see if we can help you start, continue or better yet Finish that NRTL project!